Respiratory protection workshop, black area.
Stainless steel sink with 2 MAW hoods, drainer, disinfectant dispenser. Ultrasonic cleaning device and side cabinet on the left.
Black area, right BSP02 VISU treatment system, left Miele through-loading washing machine. In the foreground on the left is a mask treatment module for BSP02 VISU.
Mobile stainless steel table on the left, treatment modules for compressed air breathing apparatus, CSA and respiratory protection masks. Right page: Miele through-loading washing machine.
Respiratory protection workshop, white area.
Workshop work surfaces with drawer cabinets and material storage cabinets.
Test workstation integrated into the workshop furniture.
Left side, BSP02 VISU treatment system with module lifting device in the foreground. Right, through-loading washing machine and mobile dryer from Miele. Through-loading device and BSP02 VISU each with stainless steel wall cladding in the white area.
Stainless steel wall paneling for the Miele washing machine, left with paneled air circulation passage between the black and white areas.
Module lifting device for easier handling, inserting the treatment modules into the rail system.
Material care room with washing machine and dryer from Miele. Left side on the wall, 2 drying panels for drying gloves and boots.
The compressor system was moved from the existing old fire brigade to the new one.
2x breathing air buffer bottles.
2x filling bar (left 5x300 bar + 1x200 bar), (right 3x300 bar) each with WEH quick filling adapters, breathing air supply management and breathing air monitoring system.
Breathing air supply management for supplying the workshop area, the test device and the BSP02 VISU with breathing air.